ALEXANDER ORR

Miami, FL

untitled 3 0000 dpr1080004 00 128202514414 280841
PROJECT PROGRESS
TVC CONSTRUCTION 85%

TVC Construction is contracted to execute the full concrete scope for the Alexander Orr – Lime Slaker project. Our work begins with the controlled demolition of existing concrete slabs ensuring responsible debris removal. Our team will then handle the structural base including excavation backfill footing and grading. Finally we will complete the structure through the precise installation of rebar and concrete pouring for all slabs on grade walls columns tie beams and suspended slabs delivering a solid primary structure ready for the client’s operations.

TERMINAL 1 CBRA ROOM IMPROVEMENTS

Lauderdale, FL

untitled 3 0004 img 3959
PROJECT PROGRESS
TVC CONSTRUCTION 90%

TVC Construction is providing the complete concrete and masonry shell package. This project requires careful execution within the airport environment. Our team will start with precision saw cutting for demolition then construct all new structural components including the new Elevator Pit, reinforced Slabs on Grade, and a new Concrete Slab over the existing roof for the expansion. We are responsible for forming pouring and finishing all concrete walls columns and beams as well as the full masonry installation to deliver a robust and fully prepared structural shell for the modern improved facility.

PUMP STATION 0300

Opa-Locka, FL

untitled 2 0004 dpr1080006 00 22122025214536686933
PROJECT PROGRESS
TVC CONSTRUCTION 40%

TVC Construction is tasked with executing the heavy structural concrete work required for the new Pump Station 1095. This is a critical infrastructure project, and our team will be responsible for building the foundation of the facility. Specifically, we will perform all necessary preparations, including formwork, rebar installation, and the strategic placement of high-strength concrete for the main pump station structures, wet well, and associated infrastructure walls and slabs. Our goal is to ensure the core structure is durable and built to the highest specifications to support the entire station’s operational life.

THE PRIVATE SUITE MIA

Miami, FL

untitled 2 0000 dpr1050001 00 08012026100244746377
PROJECT PROGRESS
TVC CONSTRUCTION 80%

TVC Construction is the dedicated concrete and masonry shell contractor for The Private Suites at MIA project, responsible for delivering the complete core structure. Our scope encompasses all necessary concrete work, beginning with the demolition of existing basement slabs and the execution of earthwork and foundations (including excavation, grading, and continuous footings). We will form, supply, and place 4,000 psi concrete for all slabs on grade, columns, concrete walls, beams, and tie beams, in addition to providing the complete masonry and suspended slab package, ensuring a robust structure compliant with all project documents.

SHADOWOOD SQUARE

Boca Raton, FL

shadoowood
PROJECT PROGRESS
TVC CONSTRUCTION 10%

TVC Construction will provide all labor, materials, and equipment for earthwork, grading, and the installation of concrete foundations and footings across all specified buildings. The scope for Building I includes the demolition of block walls and selective saw cutting of existing slabs, involve the execution of concrete slab-on-grade with moisture barriers and a trowel finish. Additionally, TVC will construct concrete beams, tie columns, and masonry walls with bond beams and solid-filled grout cells as required by the structural plans